Laserfiche WebLink
LIST OF FIGURES <br /> • <br />Figure No. Page <br />13-1 Typical Road Embankment 13 <br />13-2 Typical Road Cut 14 <br />13-3 Typical In-Wash Culvert 25 <br />13-4 Typical Cross-Drain Culvert 26 <br />13-5 Typical Access Road Section 29 <br />13-6 Typical Light Use Road Section 36 <br /> LIST OF ATTACHMENTS <br />Attachment No. <br />13-1 General Hydrology Design Methods <br />13-2 Diversions <br />13-3 Design Report Sediment Structure Pond 005 <br />13-3A Geotechnical Investigation Proposed Earthfill Dam for Pond 005 <br />13-36 Engineering Geologic Ground Stability Investigation, 005 Gulch and Vicinity (Haul Road GI <br />13-3C As-Built Report Sedimentation Structure Pond 005 <br />13-4 Sedimentation Pond 006 -Phase II IAs-Built) <br />13-4A Landslide Monitoring Plan (Near Pond 006) • <br />13-4B Road A Landslide Remediation Plan <br />13-4C Sedimentation Structure Pond 006 and Pre-Settling Basin -Phase IV Design Report <br />13-4D Haul Road A/Pond 006 Landslide Remediation Plan <br />13-4E ~ Sedimentation Structure Pond 006 - Phase V Design Report <br />13-5 Design Report Temporary Sedimentation Structure Pond 009 <br />13-5A As-Built Report Temporary Sedimentation Structure Pond 009 <br />13-56 Drainage and Sediment Control Plan II-W South Extension <br />13-5C Sedimentation Pond 015 Stability Analysis <br />13-5D As-Built Report Sedimentation Structure Pond 015 <br />13-5E Sedimentation Pond 016 Stability Analysis <br />13-5F As-Built Report Sedimentation Structure Pond 016 <br />13-5G Sedimentation Pond 017 Stability Analysis <br />13-5H As-Built Report Sedimentation Structure Pond 017 (Reserved) <br />13-6 Ditch Calculations <br />13-6a General Design for Haul Road Ditch Porous Rock Check Dams <br />13-7 Culvert Calculations <br />13-B General Design for Catchment Basins and Catchment Ditches <br />13-9 Light-Use Roads -Generic Culvert Calculations <br />13-10 Haul Roads Construction Summaries. • <br />13-11 Stock Tank Design <br />// Revised 6107 <br />