Laserfiche WebLink
<br />Industrial Discharge Permit Inspection Form <br />Page 4 <br />12. Describe the physical condition of each discharge point. Is it <br />discharging? If so, at what flaw? <br />-001 - No discharge. There was mini mal flow in the creek; no problems <br />noted. <br />-002 - No discharge. The stream was dry. (There has been no discharge <br />from this pond for years, if ever.) <br />-003 - No discharge. The stream was dry. <br />-004 - No discharge. The stream was dry. <br />13. Is the permittee maintaining records as required in the permit? <br />-Yes. <br />14. Evaluate the potential for groundwater impact. <br />-With the new impoundment regulations (Regulations for the State Discharge <br />Permit System, 6.15), Mined Land Reclamation Division will need to <br />evaluate the pond system for groundwater impacts. However, the water <br />table is fairly low in the area, and so no significant groundwater impact <br />is expected. <br />15. Additional Co~mnents: <br />-NA <br />Include a site sketch of the facility and treatment system. If the permit <br />has an accurate and detailed sketch, simply refer to the permit. <br />See attached. <br />