Laserfiche WebLink
COLORADO DIVISION Of MINERAIS A)m GEOLOGY <br />SCRAPER CAST 6 PRODUCTION DATA WRICSHEET <br />REVISIpI DATE: Apr11. 1995 <br />Sheet 1 of 2 sheets <br />REFERENCES: 1) COST REFERENCE GUIDE <br />2) CONTRACTORS EWIPIF.NT COST GUIDE <br />3) COLORADO CONTRACTORS ASSOCIATION <br />NAGE RATE SCHEDULE <br />4) UTERPILINi PERFORWINCE HANDBOOK <br />SQRI(SHEET FILENAIR: 627E-PPR.SAC1 <br />MACHINE DESCRIPTION: UT 627E TANDEM POVd=REU SCRAPER N/PUSH-PULL ATT. 6 ROPS <br />COST ADJI1SI11ENT FACTOILS BASE VALUE ADJUSTED VALUE <br />Acquisition Cost: 5457.690.00 5348.957.50 <br />Ecorn~ic L1fe Iburs: 17000 12200 <br />ROPS Cab Econ. Life Nrs: 17000 WA <br />Annual Use Hours: 2112 1500 <br />Mech. Labor Cost-Zone 1: (27.15 527.15 <br />-Zone 2: t27.15 527.15 <br />Fuel Cost per gal.: 50.94 50.94 <br />Cube Lost: 54.49 54.49 <br />Tire Life Hours: 2700 2775 <br />Tire Purchase Price: 522.059.00 524.715.26 <br /> I I--•• BASE ONNERSIIIP b OVERHAUL COSTS ---I •------• --••---• BASE OPERATING COS7S -.. .- ' -- <br />BISIC 1100EL 6 ATTACHIfEHTS I DESCRIPTION I DEPRECIATION 0110/CFC LABOR PARTSI LABOR PARTS F)lEL LUKE TIRES G.E.C. <br />Machine Model No. UT 627E x/ROPS 514.78 518.78 55.78 515.91 56.94 512.74 516.08 54.49 58.11 30.53 <br />Attadrent /1 : (PUSH-PULL INCL.) f0.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Attacl~ent 112 N/A 50.00 50.00 50.00 50.00 50.00 50.00 f0.00 50.00 50.00 50.00 <br />Attsdarnt /3 N/A f0.00 50.00 50.00 f0.00 f0.00 50.00 50.00 50.00 50.00 50.00 <br />COST SUBTOTALS 514.78 518.78 55.78 515.91 56.94 512.74 516.08 54.49 58.17 50.53 <br /> I I-• A0.IUSTID 01d1ER5T1IP 6 OYERfUWL OOSTS -I ---•---• --- ADJUSTED OPERATING COSTS --- ------- <br />FAST ADJUSTMENT FACTORS ~ FACTOR VALUE I DEPRECIATION OVERHEAD LABOR PMTSI LABOR PMTS FUEL LIKE TIRES G.E.C. <br />Aoquisittan Cost 0.7624 511.27 WA WA WA N/A N/A N/A WA N/A N/A <br />Eoorparic Life 1.3934 515.70 WA f8.05 522.17 f9.67 517.75 N/A WA H/A H/a <br />Amwl Usage 1.4080 515.87 (26.44 N/A WA N/A WA N/A WA N/A N/A <br />Double shifts .750depr.-.SOOohd (11.90 513.22 WA WA N/A N/A N/A WA WA N/A <br />Triple Shlfts .667depr.-.333ohd 510,58 58.81 WA WA N/A NIA M/A N/A N/A x/A <br />Mechanic Cost - Zone 1 1.0000 N/A WA 58.05 WA 59.67 WA WA WA N/A N/A <br />• Zone 2 1.0000 WA WA f8.05 WA 59.67 N/A WA N/A N/A N/A <br />Fuel/Lube/Tire Cost Variable WA N/A N/A N/A N/A N/A 516.08 54.49 58.91 50.53 <br />Scraper Util. -Zone 1 100.00% N/A N/A 58.05 522.17 59.67 517.75 516.08 f4.49 58.91 50.53 <br />- Zone 2 100.00% N/A WA 58.05 522.17 f9.67 517.75 516.08 54.49 58.91 50.53 <br />DJIISTFD COST SUBTOTALS •S.SHIFT -ZONE 1: (15.87 526.14 58.05 522.17 59.67 517.75 516.08 54.19 58.91 50.53 <br /> -ZONE 2: 515.87 526.44 f8.05 522.17 59.67 517.75 f16.OB 54.49 58.91 50.53 <br /> -D.SNIFTS•ZONE 1: 511.90 513.22 58.05 fj2.17 59.67 511.75 516.08 54.49 58.91 50.53 <br /> -ZONE 2: 511.90 513.22 58.05 522.17 59.67 511.75 516.08 54.49 58.91 50.53 <br /> -T.SHIFTS-ZONE 1: 510.58 58.81 58.05 522.17 59.67 511.75 316.08 54.49 58.91 50.53 <br /> •ZONE 2: 510.58 58.81 58.05 122.17 59.67 517.75 516.08 14.49 38.91 50.53 <br />• <br />