Laserfiche WebLink
• <br />• <br />Rb1DABLE EQUIPMENT: <br />---------- Total Eqp- Fleet Size Haul Trip Return Trip <br />Machine Description Lost/hr (ro. hauled) Cost/hr Cost/hr <br />_~__________________________________________z__________________________.________________a____=_________ <br />Farm Equipment (60.23 t f60.23 560.23 <br />Subtotals 160.23 560.23 <br />1108/DEMOB SUPPORT ELNII PMEM7: ----- ----- <br />sheet 2 Of 2 <br />-- ----- Neight Owrerchip Naul Rip Flee[ Size Xeul Trip Return Trip DOT Permit <br />Man-ROedeble Eop. Description (tom) Cost/hr Cost/hr (ro. hauled) Lost/hr Cost/hr Loct/ee <br />$IbCOCBl6 50.00 SO.DD fO.DD <br />Total Eqp. Fleet Size Raul Trtp Return Trtp <br />Rosdable Eop. Descriptim Cost/hr (ro. hauled) Lost/hr Cost/hr <br />Sibtotals 50.00 f0.00 <br />EQUIPMENT RAUL DISTANCE E TIME <br />Nearest major City or town within project area region: Trinidad <br />Total one way travel dietence 5.0 miles, Average travel speed = 30.00 mph. <br />Job ifine - Non Roadeble Equip.= ~- hours load Roedsble Equip.= N/A hours load <br />0.17 hours hwl 0.17 hours hwl <br />hours unload M/A hours Inlosd <br />0.17 hours return 0.17 hours return <br />JOB COST <br />Total Mob/Demob Cat = 5258.32 <br />C.=i. - <br />MOTE: Man-roedeble equipment (haul rig regal red to transport) mob/demob cotta based an 2 round trips, each trip <br />comiating of a one-way loaded haul and a one-way empty return. Roedable equipment (ro hwl rtp regal red) <br />code bsaed on one routd trip- Colorado DOT requi ree epee iel perwf to for overal ze equf pmmt on Qertafn <br />speelf ied road aep~ents with in the State. Separate permits are required for each rig an exh loaded trip. <br />Additiarolly, pf lot care (oro or two per rip deperdSrg on degree of overaf ze) are also regal red for oversize <br />• equipment heulirp, and loading/unloading Liars east be Increased substentielly for equipment which east be <br />partially diwrontled for tramport and re-essemblzd st the jab cite. Costs for liftirq equipment end other <br />support equipment needed for this work should be ircluded in the sob/demob costs. <br />