Laserfiche WebLink
XOURLY PRODUCTION: <br />______ ___ ______ I Job Cardition Cor <br />Kti on Fxtors <br />• <br />Scraper Cycle Time e <br />I - <br />---- -------- ~ Site altitude 6500 ft. <br />Load = 0.9 min. ~ -_-- <br /> - ~ Alt. adJustment .. 1 <br />Maneuver i spread = 0.6 min. ~ Jab efficiency ... 0.83 ([sh/d) <br />Travel time (haul i return): ~ Net Correction 0.83 <br />Naul route <br />Road Length Grade Rolling Total Velocity Travel times <br />seg. N (ft) res.(X) rec.(X) res.(X) (fpm) (min) <br />1 1800 3.00 3.30 630 1490 1.31 <br />Haul time = 1.31 min. <br />Return route <br />1 M1800 -3.00 3.30 0.30 3020 0.79 <br />• <br />•1st 6 lest seg. adj. for xcel./decal. Return time = 0.79 min. <br />Total Cye le Time = 3.60 min. <br />-- ~ Machine Volume <br />Machine Payload <br /> struck capacity = 1<.00 <br />Materiel Nei ght =2550.00 lbs/LLY ~ Heaped capscity = 20.00 <br />Mat. deecript ion ~ -- --------- <br />Earth -Dry pecked ~ Average 17.00 LCY <br />Rated payloed....= 48,000 lbs. ~ Adlusted volume = 17.00 LCY <br />Payload volume...= 18.82 LCT <br />Ihindjusted productim per scraper or push-putt pair 566.99 LLY/hr <br />Adjusted production ................ .................: 469.77 LCY/hr <br />Adjusted hourly fleet produttian ...............:....: 469.77 L[Y/hr <br />JOB COST: <br />_•~•= <br />Fleet alze 2 Scrsper(s). Total Jab i(am: 23.47 Rours <br />• <br />Unit Cost 50.652 /LCY Total Jab Coat: f7, 186 <br />