Laserfiche WebLink
6-21-1999 7:08PM <br />EFF!~RT <br />vr. <br />A ~E}'S AT (.A}1' <br />FROM~IHON <br />Mr. Chuck Williams <br />Page 15 <br />June 21, 1999 <br />ASSOCIATES 303 436 9396 <br />of primary drinking water standards. That means that EPA must obtain (or have the project <br />proponent obtain) the necessary data ro make these determinations before, not after, the UIC <br />permit is issued. <br />IV. CONCLUSION. <br />P. 16 <br />To meet its obligations under NEPA and the Safe Drinking Water Act, EPA has no <br />choice but to withdraw the draft permit and to commence preparation of an SE1S using complete <br />and correct ground water baseline data and information about the injection pra:ess, subsidence <br />resulting from operations, and the likelihood of upward movement of contaminants from the <br />injecrion zone into underground sources of drinking water. <br />We appreciate the opportunity to comment on the draft permit, and look forward to <br />participating in the upcoming public meeting to be held in Meeker. <br />Sincerely, <br />ALM/jms <br />McGli-ION 6c LEFFERT, P.C. <br />Anne L. McGihon <br />cc: Kirk Cunningham, Conservation Chair <br />Rocky Mountain Chapter, Sierra Club <br />15 <br />