Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task#: 06a <br />Date : 04/19/2002 <br />User : RCO <br />State :Colorado <br />County :Gunnison <br />Site : Seahorse Ranch West Grav <br />PermiUjob#: M-2001-113 <br />Abbreviation :none <br />Filename : M113-O6a <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.50 NA <br />Operating cost/hour : $65.98 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $2799 NA <br />Total unit cost/hour : $143.48 ~ Total fleet costlhour : $143.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 11,906 LCY factor : NA volume: 11,906. LCY <br />Source of estimated volume : 7.38 ac x 12" <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient: 0.00 % (~ <br />Average site altitude : 7, 700 feet <br />Material weight : 2, 550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />Operator skill : 0.75 <br />Material consistency : 1.20 ~ <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency: 0.63 <br />Spoil pile : 0.70 <br />Push gradient . 1.00 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.47 <br />Source <br />Adjusted unit production : 660.05 LCYIhr <br />Adjusted fleet production : 660.05 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 18.04 Hours <br />Unit cost : $0.217 /LCY Total job cost : $2 588 <br />_-*. <br />