My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59919
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:06:58 PM
Creation date
11/20/2007 6:30:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001113
IBM Index Class Name
Permit File
Doc Date
4/19/2002
Doc Name
Cost Summary Form
From
DMG
To
American Concrete and Gravel LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task#: 06a <br />Date : 04/19/2002 <br />User : RCO <br />State :Colorado <br />County :Gunnison <br />Site : Seahorse Ranch West Grav <br />PermiUjob#: M-2001-113 <br />Abbreviation :none <br />Filename : M113-O6a <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.50 NA <br />Operating cost/hour : $65.98 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $2799 NA <br />Total unit cost/hour : $143.48 ~ Total fleet costlhour : $143.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 11,906 LCY factor : NA volume: 11,906. LCY <br />Source of estimated volume : 7.38 ac x 12" <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient: 0.00 % (~ <br />Average site altitude : 7, 700 feet <br />Material weight : 2, 550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />Operator skill : 0.75 <br />Material consistency : 1.20 ~ <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency: 0.63 <br />Spoil pile : 0.70 <br />Push gradient . 1.00 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.47 <br />Source <br />Adjusted unit production : 660.05 LCYIhr <br />Adjusted fleet production : 660.05 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 18.04 Hours <br />Unit cost : $0.217 /LCY Total job cost : $2 588 <br />_-*. <br />
The URL can be used to link to this page
Your browser does not support the video tag.