Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 01a <br />Date : 04/19/2002 <br />User: RCO <br />State :Colorado <br />County :Gunnison <br />Site : Seahorse Ranch West Grav <br />Permit(ob# : M-2001-113 <br />Abbreviation :none <br />Filename : M113-O1a <br />Agency or organization name : OMG <br />Permit or other job action :New 112 <br />Task description :Phase 1 <br />HOURLY EQUIPMENT COST <br />grade slopes, pit interior, pad areas <br />Basic machine : Cat DBR - BSU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank rioner <br />Horsepower : 305 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosVhour : $49.50 NA <br />Operating cosVhour : $65.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $27.99 NA <br />Total unit cosVhour : $143.48 Total fleet cosUhour : $143.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 7,482 LCY factor : NA volume: 7,462 LCY <br />Source of estimated volume :9.25 ac x 8" <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (l shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,700 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Decomposed rock - 50% Rock, 5 0% Earfh Adjusted unit production : 552.75 LCYfhr <br /> Adjusted fleet production : 552.75 LCY/hr <br /> - ,;~ <br />JOB TIME AND COST <br />Fleet size : ~ 1 Dozers) Total job time : 13.50 Hours <br />Unit cost : $0.260 /LCY Total job cost : $1,937 <br /> ;. <br /> ~. <br />