Laserfiche WebLink
,~ •.. BASIN RESOIfRCEB, INC. <br />• SEDIMENTATION POND INSPECTION FORM <br />POnd NEW ELK NPDES N0,004 <br />?~- Date of Inspection <br />~ .' <br />cy of the vegstntive cover: xcelle Moderate, Few, Pooz <br />2. Erosion forming gullies: Extensive, Some, Very Farr, on <br />.q <br />Y <br />3. Ia wave action cnusinq erosion: <br />On the upstream embarilonent? Yea No~ <br />• At the principal spillway inlet? Yea No <br />4. Erosion of the downstream toe of the embankment? Yea No~_ <br />The cause of the erosion la attributed to: <br />5. Ia seepage occurring through the dem7 Yea No~•_ If yes <br />could this seepage cause potential inatnbility? Yes No~_ <br />Explain• <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working order? Yes~[_No <br />2. Ia the inlet free of debris and restrictive saterial?Yes~No <br />r-'.< . <br />3. Is the diacharge outlet free of restrictive material? Yes~No_ <br />4. Is erosion occurring et the discharge outlet? Yes No~If <br />yes, <br />evaluate the severity: Extensive Moderate Just starting None <br />'r <br />N, EMERGENCY SPILLMAY " <br />1. is the overall emergency spillway system capable of passing <br />design storm diacharge? Yes_~No <br />2. Does it appear as if the emergency'spillway hae discharged water <br />since the last inspection? Yea No~_ <br />3. Is erosion occurring et any section of the emergency spillway? <br />." Yes No,~_ Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the deli n storage capacity of the reservoir bean eurpaseed? <br />~~ Yee No~ If yea, <br />explein• ~ <br />(_,:~~• • <br />~•~:ti, Please ndd nny spacial co~enta eoncerninq potentially dangerous <br />problems on the back of thi^ sheet. <br />Inspector <br />