Laserfiche WebLink
• <br />GOLD HILL MILL <br />~ BOND CALCULATION <br />BY J. WAYNE TATMAN <br />FROM WILLIAM C. YORK-FEIRN <br />MILL SITE <br />• <br />miIl tailings <br />bldg. dam structure <br />3.31 ac. - 0.19 ac. - 0.83 ac. = 2.29 ac. <br />~ Regrading the area - 4 hrs. C $85/hr. _ $ 340.00 <br />Spread 3" topsoil <br />(.25' x 99,752 sq. it. = 924 cu. yds. <br />5~1o grade downhill $ 166.00 <br />• Hau1924 cu. yds. topsoil <br />$GO/15 cu. yds./trip x 41 trips <br />624 cy. _ $ 2,496.00 <br />Buy 624 cu. yds. C~' $14/cu. yd. _ $ 8,726.00 <br />• <br />Seeding, mulching, fertilizing <br />~ $550/ac. x 2.29 ac. _ $ 1,259.00 <br />I • TOTAL $12,981.00 <br />I• <br />I• <br />I• <br />I• <br />