Laserfiche WebLink
<br /> MINE INFLOW STUDY <br /> 13 MINE <br /> SNONMASS COAL COMPANY <br /> 11/22/83 <br />ARER 50URCE FLOW TEMP COND pN <br />_ _ csPM) c°c) (uNNOS) cw) <br />1 Roof Bolt koles .25 7.5 1050 7.6 <br />2 Roof (Fault (.1 5.8 1160 7.7 <br />3 Roof Bolt Noles .25 8.9 1160 T.9 <br />4 Coal Floar Interface x.01 - - - <br />5 Roof Fali .5 6.5 1560 7.7 <br />6 Roof Bott Holes .1 6.2 1260 7.5 <br />7 Fault -Roof 8o1t Notes 5.0 7.0 1510 7.0 <br />8 Roof Bolt Noles 35.0 11.0 1630 6.7 <br />Total Nine Inflow 93.6 GPM <br />Total Mine Discharge 110 GDM <br />Total Consumption 0 GDM <br /> <br />.5/27/84 <br />FLOIi TEMP COND pH <br />{GPM) (°C) (UMHQS) (SU <br /> <br />1.0 12.0 1280 8.1 <br />< .10 11.5 1350 7.8 <br />1.5 13.2 1440 7.9 <br /> DRIED UP <br />1.0 9.4 1355 7.8 <br />5.0 13.0 1175 7.6 <br />35.0 13.2 1350 7.3 <br />50.0 13.6 740 7.2 <br />