Laserfiche WebLink
<br />PROJECT IDENTIFICATION <br />Agenry or organization name : DMG <br />Task p : 01a Stale : CO/o2cb Permigjobf/ : M-2000.116 <br />Date : 1 /228000 County : La Pfata Abbreviation :none <br />User : SSS Site :Villa Gmve PIf Filename : M716-Ofa <br />Permit or other job action :New 1/2c Applfcafion <br />Task description :Cut and fill reduction of Interl or pit highwall <br />HOURLY EQUIPMENT COST Basic machine : Car OBN (1996) Horsepower : 2B5 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : RDPS Cab ShiO hasis : 1 per tlay <br /> Anachmenl no. 2 :3-shank npper <br /> Utilization % Cost data source : (CRG) <br />Cost Breakdown : Ownership cosVhour : 841.70 NA <br /> Operating cosUhour: 555.84 100 <br /> Ripper op, cost/hour : 51.39 20 <br /> Operator cosVhour: E23. 12 NA <br /> Total unit cosghour : 5121.25 Total Beet cosghour : §121.25 <br />- r .) <br />.. _ , <br />,.; ~ eta <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 9,982 LCY lector: NA volume: 9,982 LCY <br />Source of quantity fake-oR :Assume max/mum 1150'L x 25'H h/ghwa/l <br />Source of est. swell lector : NA <br />' to .«aefh. rrgrrn ¢^c.^•ry {{ ~r.. .: , _ <br />. <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />Average push distance : 85 feet Source <br />Unadjusted hourly production : 1034 LCYIhr <br />Material consistency description <br />Compacted 011 or ernbankmenl <br />Average push gradient : 16.50 % (nag) <br />Average site altitude : 7,880 feet <br />Material vreighl : 3,250 IhslLCY <br />Material weight description : <br />Gravel - Plrrun <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />Operator skill : 0.75 (avg <br />Material consistenry : 0.90 (Cef } <br />Dozing method : 1.00 (gen <br />Ysibiliry: 1.00 (avg <br />Joh eficienry: O.B3 (1shiN~ <br />Spoil pile: O.BO (lnb, <br />Push gradient: 1.36 (Cefh <br />Altitude: 1.00 (Car} <br />Malarial vreight : 0.71 (Lal } <br />Blade type : 1.00 (S w <br />NeI correction : 0.43 <br />Adjusted unit production : 445.55 LCY/hr <br />Adjusted Oeel production : 445.55 LCY/hr <br />Total job time : 22.40 Hours <br />Unit cost : 50.272 /LCY Total joh cost : $2,716 <br />