My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59841
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:06:55 PM
Creation date
11/20/2007 6:27:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
FACILITIES WORKSHEETS
Section_Exhibit Name
TAB 25 ATTACHMENT 25-4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mine Area Yoast • <br />Project Facilities-Perm Roads <br />Task Narrow Roads <br />WORKSHEET N0. PR-2 <br />PRODUCTIVITY FOR DOZER USE - RIPPING <br />Dozer Activity: Push 34 ft. 8 12 ft. of gravel/scoria surfacing back onto road surface. This <br />leaves the road 20' wide with approximately an additional foot of surfacing material. A compactor will <br />compact this material and a motor grader will shape it. <br />Dozer Used: D-11N, SU blade, 14G Motor Grader <br />Description of Dazing: 80' push <br />Volume: 1' x 34' x 6,000 = 7,600 cy <br />1' x 12' x 6,000 = 7,100 cy <br />14,700 cy <br />Productivity Calculations: <br />Operating: 78 <br />Grade: see EMF <br />Material Fac[or: see EMF <br />Push Distance: see EMF <br />Dozing Factor: see EMF <br />Visibility: 90 <br />Altitude: 91 <br />Dual Tilt: 105 <br />Spoil Pile Factor: see EMF <br />Minutes worked per Hour: 50 <br />Bank Material Density: see EMF <br />Loose Material Density: see EMF <br />Direct Drive Trans: 100 <br />Total Adj. Factor: 0.3349 <br />Net Hourly Production = 2.803 yd3/hr K 0.3349 = _631 _ yd_/hr <br />normal hrly prod. op. adj. factor <br />Hours Required = ( 10.375 yd_ / 631 yd_/hr) x = 30 hrs <br />volume to be moved net hrly. prod. <br />Cost per Hour = f236.22 (D11-N) <br />83.31 (14G) <br />D.60/cy for compactor <br />Total Cost = 30 hrs. x f236.22 cost/hr S 7,087 <br />30 hrs. x f 83.31 cost/hr = 2,500 <br />5.060/cy x 14,700 cy ~ 8,820 <br />S'i8,407 <br />REFERENCES: <br />Table 25-2-b <br />Attachment 25-2 <br />• <br />• <br />25-4-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.