Laserfiche WebLink
• Nine Area Yoast <br />Project Hydrologic Facilities <br />Task Remob Sed Pond Equipment <br />NORKSNEET N0. HYD-4 <br />MISCELLANEOUS RECLAMATION ACTIVITIES <br />Description: Remob equipment to complete sediment pond removal. Assume small dozer from <br /> Hayden Colorado. <br />Equipment: D-B <br />Volume: <br />Cost: Ownership = S 44.67/hr <br /> Heul Rig = S 94.27/hr. <br /> Heul Trip = 5138.94/hr. <br /> Return Trip = S 94.22/hr <br />• 2 hrs (max) each way = 2 x 5138.94 = 5277.88 <br /> 2 x S 94.27 = 5188.54 <br /> 5466.00 <br />• <br />25-4-17 <br />