Laserfiche WebLink
There aze no costs for removal of equipment since there will be no permanent equipment, struc- <br />tures or foundations within the permit area. DMG overhead consists of contractor profit, bid prepa- <br />ration, etc and are estimated at 19.5% of direct costs. <br />Map Exhibit E-2 shows the site after full reclamation. The cross-section lines A and B are used to <br />show the original and final topography. These cross-sections are given on Map E-3. <br />The revegetation seed mix for the wetlands was designed to provide a healthy wetland that can be <br />used by all types of wildlife. Cattails, sedges and rushes will invade the site naturally and will add <br />to the diversity of the wetland. <br />The seed mix for the wetland edge of the lake is given below. This mix will be applied on approxi- <br />mately 0.64 acres. <br />North Fork Pit March 04 36 <br />9 Seed, mulch, fertilize (3.9 acres@ $1000/acre) <br />Drill seed on flat azeas. Mulch at 30001bs per <br />acre. 2 $3,900 <br /> Total Direct Costs 20 days $27,785 <br /> DMG Costs (19.5% x direct costs) $5,418 <br /> Total Bond Amount $33,203 <br />