Laserfiche WebLink
~~ <br />~_, <br />III IIIIIIIIIIIIIIII ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Dcpanmenl of Nannal Resources <br />I31 J Shevman 51., Rrwrn 21 S <br />Dcnvcr, Colorado 1401111 <br />Phone'Ii0ll rifiL-"t567 <br />FA%: IJ03) H72-BIOL <br />October 11, 1996 <br />Mr. Chester Barnard <br />Barnard Quarries <br />245 Evans Street <br />P. O. Box 86 <br />Lyons, CO 80540 <br />Re: Barnard Quarry, File No. M-96-079, Receipt of 110 Construction <br />Materials Reclamation Permit Application Package <br />Dear Mr. Barnard: <br />I~~~~ <br />DEPARTMEIV7' OF <br />NATURAL <br />RESOURCE <br />Ray Romer <br />Governor <br />lames 5. Lochhead <br />Execmne Director <br />Michael B. Long <br />Division Director <br />On October 10, 1996, the Division of Minerals and Geology received your the 110 Construction <br />Materials Reclamation Permit Application package for the Barnard Quarry, File No. M-96-079. <br />Preliminary review of the information received determined that the following items mu t be <br />received before the Division can consider your application as being submitted and technical <br />review can begin: <br />APPLICATION FORM: Page 4 and 5 of the application form were not completed. <br />Enclosed please find the original page 4 and 5 from your application form which you <br />must complete and return to the Division along with the missing exhibits which are listed <br />as follows. <br />EXHIBIT B -Site Description (Rule 6.3.2(a)): You must address Item (a) to the extent <br />necessary to demonstrate compliance with the applicable performance standard <br />requirements of Rule 3. At a minimum, you must include a description of the vegetation <br />and soil characteristics in the area of the proposed operation. <br />EXHIBIT D -Reclamation Plan (Rule 6.3.4): (1) The purpose of the Reclamation <br />Plan is to describe the timing, procedures, criteria and materials that will be used to <br />reclaim the affected land to the proposed future land use. This plan must be correlated <br />to Exhibit E -Map. The description of the Reclamation Plan must be adequate to <br />satisfy the requirements of Section 3.1 and demonstrate compliance with Rule 3. At a <br />minimum, the Application shall include the following information: <br />(a) specify at what point in the mining plan and to what depth(s) overburden <br />will be replaced in relation to ongoing extraction. <br />