My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26216
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:43 PM
Creation date
11/20/2007 6:25:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
7/19/2003
Doc Name
Termination Request ‎(COG-850040)‎
From
Basin Resources Inc
To
CDOH WQCD
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> -w ~ iv - iq5~ <br />ie ,,;. ,Officta a.!s O ~~ <br />l <br />Water Quality Control Division a , 2 en <br />a. <br />:, <br />Permit Termination Form _ <br />, <br />. <br /> <br /> r~, <br /> ~ ''"''~"~~~r- <br />~c d <br /> §R <br />Jro <br />~ ,~- <br /> t' ~}~ „I~i! ~ r„~ <br />~~ <br />~ <br /> T gnat-~ <br />OK <br />n~ <br /> ~ <br />a <br />. -. <br />Facility Name: Basin Resources, Inc. Pemut No.: COG-850040 <br />Golden Eagle <br />Le al Contact: Thorrtas G. Durham, President Legal Contact Phone No: 406 252-2277 <br />Facility Contact: Ronald Tho son, Consultant Facili Contact Phone No.: (7I9 868-2027 <br />Facility Address: Western Sun Coal Company Legal Location: NE '/<, Sec. 29, Sec 29, T33S, R67R% <br />P.O. Box 7137 <br />Billings, MT 59103-7137 County: Las Animas <br />Please answer the following questions and sign the certification. If you have any questions regarding your facility and <br />the information required, please contact your District Engineer, Dave Knone at {719) 545-4650 x13. <br />Purpose of Request no longer discharee Dischazge was to Pureatoire River <br />1. Is the construction complete? Facility has been reclaimed <br />a. If not, is there any plan to complete constmction in the future? <br />b. If so, is there an estimate of when? <br />Date for start-up <br />2. If the facility is operational. is any process or other wastewater being produced? <br />How much? gpd <br />a. If yes, is the water being treated? <br />b. What form of neatment is utilized? Discuss sizes <br />of unit processes and any chemical additions. <br />c. Is any of the process or any other wastewater or water <br />being discharged to waters of the state? (This <br />includes groundwater in cases like unlined lagoons.) <br />1. If yes, identify discharge point(s). <br />d. Is the facility designed to be anon-discharging (evaporative) system. <br />^Yes ^No N/A <br />^Yes ^No <br />^Yes ^No <br />^Yes ~ No <br />^ Yes ^ No <br />^ Yes ~ No <br />^ Yes ^ No N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.