My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59779
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:06:52 PM
Creation date
11/20/2007 6:25:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Permit File
Doc Date
3/21/1983
Doc Name
INFORMATION REQUEST TAIL POND 4 SEEPAGE CONTROL PLAN
From
STANDARD METALS CORP
To
WQCD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. Don Simpson <br />Permits and Enforcement Section <br />lsa ter Quality Control Division <br />Colorado Department of Health <br />!+arch 21, 1983 <br />Page 2 <br /> <br />3. Seepage control meaavres submitted for Tailings Pond No. 9 were <br />dcveloned to eliminate lateral seepage visibly exiting the embank- <br />ment toe only, acid not to eliminate or contain vertical seecage <br />occurring through the pond and alluvium below. The stability of <br />the tailings imno~ur~dment is based on seepage through the pond <br />and underiyinc substrate to ~~,aintain minimum phreatic levels in <br />the Dond emban'+~'nent. <br />9. Infiltration o_` waters from the Animas River into the tailings <br />cr:~a-.~laie nt toe was deternin ed by visual inspection during high <br />runoff. No water cuality analyses were performed to determine <br />the flow origin because contamination problems exist at the toe <br />due to windblown and eroded tailings material from the emban~~nent. <br />5. Seepage control Dlans submitted for Tailings Pond No. 4 to date <br />do not propose installation of a positive outfall or discharge <br />point, and amendment to the discharge permit issued for the mill <br />facility is not anticipated. <br />I believe the proceeding information addresses your recuest. If you <br />reouire additional information or have any cuestions regarding the <br />submitted information, please contact me. <br />Very truly yours, <br />STANDARD M~TA LS CORPORATION <br /> <br />William Dotterrer <br />Environmental Engineer <br />[JD : mb <br />
The URL can be used to link to this page
Your browser does not support the video tag.