Laserfiche WebLink
Cripple Creek 8 Vicbr Gold Mining Company <br />Lnw Volume callepion system <br />03N999 <br /> PHASE I NOTES Phase I Prrasa I Phan 1 Phase I <br /> Pressur e Trarw Flow meter 8 Meterl Me1er2 Adlusletl Flow (buckeVwatchl Compute Average Water OualAy HVCS-Depth <br /> Ph I (Isar) (leap Rale Indrvitlual Cumin Cumm Cum Rate MeazuremerAS: Rate Daily CCBV Lab Contract Lab (teat) <br />Data Time MI R2 (gPm7 Flw (gal) Flw (gaq Flw (gall (gall gallon saconOS (gpm) Rate CN Iree Au pH CN tree CN WAD CN TOT Prep t Prep 2 Pray 3 <br /> Hach <br />Dec 24 914 0.53 035 530 25]263 4,790,224 8,501 332 308 34.1 <br />Der 25 6,501 <br />Dec 26 1627 061 035 425 271200 4,804,161 6,969 325 313 34.8 <br />Dec 2] 5,443 <br />Dec 28 1030 0.51 0 35 S B8 282085 4,815,046 2 20 fi W 5.443 883 16.8 1B 9 18 6 32 ] 31 1 34 8 <br />Dec 29 959 Ott 0.34 33] 28819] 4,82t,1SB 6.112 315 31.4 343 <br />Dec 30 915 059 0.34 630 294111 4,82],OT2 5,914 32.3 314 343 <br />Dec 71 1110 O68 0.34 535 3005]4 4,833$35 fi,4fi3 318 309 337 <br />Traretlucers Drsc.lor Caron Rinse. <br />