My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59755
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59755
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:06:51 PM
Creation date
11/20/2007 6:25:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Permit File
Doc Date
4/13/1976
Doc Name
FINAL PERMIT NPDES PN CO-0030546 BOULDER CNTY
From
CDOH
To
ANDESITE ROCK CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART II <br />Paae 5 of 10 <br />Permit No .. CO-0030546 <br />i A. MANAGEMENT REQUIREMENTS <br />Change in Discharge <br />All discharges authorized herein shall be consistent with [he terms and <br />conditions of this permit. The discharge of any pollutant identified <br />in this permit more frequently than or at a level in excess of that <br />authorized shall constitute a violation of [he permit. Any anticipated <br />facility expansion:, production increases, or process modifications <br />which will result in new, different, or increased discharges or pollutants <br />must be reported by sumbission of a new NPDES application or, if such changes <br />will not violate the effluent limitations specified in this permit, by <br />notice to [he permit issuing authority of such changes. Following such <br />notice, [he permit may be modified to specify and limit any pollutants <br />not previously limited. <br />2. Noncompliance Notification. <br />If, for any reason, the permittee does no[ comply with any maximum effluent <br />limitation specified in this permit the permittee shall provide the Regional <br />Administrator and the State with the following information, in writing, <br />within five (5) days of becoming aware of such condition: <br />1 <br />a. A description of the discharge and cause of noncompliance; and <br />• b. The period of noncompliance, including exact dates and times; or, if <br />not corrected, the anticipated time the noncompliance is expected <br />[o continue, and steps being taken to reduce, eliminate and prevent <br />recurrence of the noncomplying discharge. <br />3. Facilities Operation <br />The permittee shall at all times maintain in good working order and <br />operate as efficiently as possible all treatment or control facilities <br />or systems installed or used by the permittee to achieve compliance <br />with the terms and conditions of [his permit. <br />4. Adverse Impact <br />The permittee shall take all reasonable steps to minimize any adverse <br />impact to navigable waters resulting from noncompliance with any <br />effluent limitations specified in this permit, including such accelerated <br />or additional monitoring as necessary [o determine the nature and impact <br />of the noncomplying discharge. <br />5• Bypassing (see additional requirements under Part III) <br />Any diversion from or bypass of facilities necessary to maintain com- <br />• pliance with the terms and conditions of this permit is prohibited, <br />except (i) where unavoidable to prevent loss of life or severe property <br />damage, or (ii) where excessive storm drainage or runoff would damage <br />any facilities necessary for compliance with the effluent limitations <br />and prohibitions of this permit. The permittee shall promptly notify <br />the Regional Administrator and [he Stave in writing of each such diversion <br />or bypass. <br />
The URL can be used to link to this page
Your browser does not support the video tag.