My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59755
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59755
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:06:51 PM
Creation date
11/20/2007 6:25:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Permit File
Doc Date
4/13/1976
Doc Name
FINAL PERMIT NPDES PN CO-0030546 BOULDER CNTY
From
CDOH
To
ANDESITE ROCK CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pa°S III <br />Page 10 of 10 <br />Permit No.: CO-0030546 <br />• OTHER REQDIBr~+ENTS (Continued) <br />Testing <br />Test procedures shall confora with those procedures specified in the <br />Federal Register, Volume 38, Number 199, October 16, 1973. These <br />procedures involve the ave of one of the following references: <br />I. "Stmmdard ,`fethods for the Examination of Water and Waste <br />Water," 13th Edition, 1971. <br />2. "ASTM," Annual Book of Standards, Part 23, Water, Atmosphere <br />Analysis, 1973. <br />3`. "`,Sethods for Chemical Analysis of Water and Wastes," 1971, <br />Eavironbental Protecticn Agency. <br />Eapansioa Requirer:eats <br />Pursuant to Colorado Law, C.R.S. 1973 25-8-501(6), the permittee is <br />required to initiate engineering and financial planning for e:cpansioa <br />o_° the treatment wor'~cs whenever throughput and treatment reaches <br />• eighty-•(80) percent of design capacity. Whenever ninety-five (95) <br />percent of either the hydraulic or organic capacity of the treatment <br />works is met, the•peratttee shall camneaee construction of the <br />necessary treatment e:cpmmsion. <br />In Lhe case of a municipality, construction may be cotm~eaced, or <br />building permit issuance may be terminated, until such ecnstruction <br />is initiated, except that building permits may continue to be issued <br />for nay ccnstruction which would not have the effect of increasing <br />the input of sewage to the municipal treatment works. <br />Within three (3) scnths after the date of permit issuance, a flow- <br />measuring device shall be installed to give representative values <br />of effluent valuee at same point in the plant circuit, if not alreaay <br />a part of the wastewater plant. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.