Laserfiche WebLink
<br />III IIIIIIIIIIIIIIII <br />COLORADO OEPARTMEHT OF HEALTH <br />1210 EAST 11TH AVENUE • DENVEP., COLORADO 80220 PHONE 388-6111 <br />Eduard C. Dre~fua, H.D., H.P.H.;Esecucive Dir~ctnr <br />April 13, 1976 <br />Andeslte Rock Company <br />P.0. Box 625 <br />Lyons, Colorado 60540 <br />CERTIFIED MAIL: 993081 <br />Re: Final Permit, NPDES Permit Number: CO-0030546 (Boulder County) <br />~b <br />Gentlemen: <br />Enclosed please find a copy of the permit issued under the Federal Water <br />Pollution Control Act and Colorado Water Quality Control Act. <br />Issuance of this permit constitutes a final determination of the Division of <br />Administration of the Colorado Department of Health, in conjunction with the <br />U. S. Environmental Protection Agency and may be subject to administrative <br />• review proceedings pursuant to the State Administrative Procedure Act. including <br />an adjudicatory hearing. You are advised to consult this act and particularly <br />to consult Sactiuns 24-4-104, 24-4-10j, 24-4-102(7), and 25-$-401, C.R.S. 1'973 <br />for more information. In addition, the Regulations for the State Di=_charge <br />Permit System contains material that is pertinent to any administrative review <br />of the issu~~'~`ce of this permit. <br />Your NPDES Waste Discharge Permit requires that specific action be performed <br />at designated times. Failure to meet these requirements constitutes a violation <br />of this permit and can result in civil and/or criminal action(s). Please read <br />the perm'st very thoroughly. <br />1. All municipal and industrial facilities are required to submit self- monitoring <br />information. (PART I. B. Monitoring and Reoorting) . Frequencies and types <br />of self-monitoring are summarized in PART 1 A. Effluent Limitations and <br />Monitoring Requirements. <br />2. Monitoring and reporting requirements for feedlots are described in PART 1. <br />A. Effluent Limitations and Monitoring Re ouirements (see 2. c.) and in PART 1. <br />8. Monitoring and Reoortina. <br />3. In some instances a schedule of compliance is to be submitted if required <br />by your permit. Please note the required date as specified in PART I of <br />the permit. <br /> <br />