Laserfiche WebLink
• • III IIIIIIIIIIIIIIII <br />999 <br />JrSP~N /.['GREG4Tts i <br />-'~--~ ~ MO(INTAIN AGGREGATES, INC. <br />"yy ~.,_T µG0 <br />pE9 CA91lE ROG <br />2096 S. I-25, P.O. BOX 535, CASTLE ROCK, COLORADO 80104 <br />TELEPHONE (303) 688-4890 <br />July 23, 1993 <br />Mr. Thomas Schreiner <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Permit No. M-77-534, Empire Pit <br />Dear Mr. Schreiner: <br />On May 21, 1993 you conducted a field inspection of our gravel pit <br />to verify compliance with the mine plan. In your report you noted <br />(2) two areas of concern as follows: <br />A.) Various field problems, detailed below <br />B.) Updating the existing permit to meet the requirements of <br />Rule 2. You requested that we submit a technical <br />revision. <br />You allowed us (60) sixty days to comply with both concerns. <br />Due to a heavy work schedule we have been unable to comply with all <br />the requests. The following is a list of the field problems and <br />action taken, if any: <br />Identification of the affected area by use of monuments. This <br />work is completed. <br />Removal of sand stockpiled within 50 feet of the creek; this <br />work has been done. Regrading of approximately 200 feet of <br />streambank: this work is approximately one-half completed (see <br />photographs enclosed herewith). Our plan for long-term <br />stabilization is to place cobble stones from the toe of the <br />bank to a height of two feet followed with local willows and <br />trees to the top of the bank. <br />Remove broken concrete containing rebar from the creek. This <br />work has not yet been completed. Our plan is to remove all <br />the concrete and replace it with cobble and vegetation as <br />described above. <br />None of the permitting problems have yet been worked on. <br />We respectfully request that you allow us an additional 60 days to <br />complete all the requirements detailed in your report. <br />