Laserfiche WebLink
EMD (Panels 2 Right through 6 Right)(PR 97-04) <br />During the five-yeaz permit term covered by this application, mining will continue in the Eastern Mining. Initial <br />development of gateroads in the Eastern Mining District encountered a previously unidentified fault. This fault <br />requires TCC to redesign the submains and mains; their locations aze shown on Map 23. Development mining will <br />occur in gateroads 2 Right through 4 Right in the Eastem Mining District,. Longwall mining will occur in panels 6 <br />Right through 2 Right in the remainder of the Eastern Mining. These mining areas are shown on Map 23. <br />Longwall panels 6 Right through 2 Right will involve mining of coal contained in Federal leases COC-54608, C- <br />081330, and D-052543 and fee coal owned by Twentymile. <br />Gateroads 4 Right through 2 Right will involve mining coal from Federal lease COC-54608, fee coal owned by <br />Twentymile. Development of the Northeast submains will involve mining of coal from Federal leases C-081330 and <br />COC-54608. <br />NMD (Panel 12 Right through 16 Right)(PR 99-OS) <br />During the five-year permit covered by the application (1998-2003), mining will continue in the Eastern Mining <br />District (as approved in Permit Revision 97-04) and into the Northern Mining District. Development mining will <br />continue in gateroad I1 Right through 18 Right, the Northeast and Northwest Mains, and longwall panels 12 Right <br />through 16 Right. The mining area is shown on Map 23. <br />Longwall panels 12 Right through 16 Right will involve mining of coal from Federal lease COC-54608, State lease <br />CO-3229 and fee coal owned by Twentymile Coal Company. Gateroads 11 Right through 18 Right will involve <br />mining coal from the same leases as described for the longwall panels. The Northeast Mains, in addition to Federal <br />tease COC-54608, and State lease CO-3229, Twentymile Coal Company will mine coal from the Myron Walker Trust <br />lease. <br />NMD (Panel 17 Right through 21 Right)(PR 03-06) <br />During the five-year permit covered by this application (2003-2006), mining will continue in the Northern Mining <br />District. Development mining will continue in gateroad 18 Right through 22 Right, bleeders, the Northwest Mains, <br />and longwall panels 17 Right through 21 Right. The mining area is shown on Map 23. <br />Longwall panels 17 Right through 22 Right will involve mining of coal from State lease CO-3229, fee coal owned by <br />Twentymile Coal Company, and federal and fee coal to be obtained by TCC. Gateroads 18 Right through 22 Right <br />and bleeders will involve mining coal from the same leases as described for the longwall panels. The Northwest <br />Mains will [nine coal from State lease CO-3229. <br />U <br />PR 03-06 2.05-7.1 05/06/04 <br />