Laserfiche WebLink
<br />-2- <br />2. The operation will not adversely affect the stability of any significant, <br />valuable, and permanent man-made structure located within two hundred feet of the <br />Affected Land, except where there is an agreement between the Operator and the persons <br />having an interest in the structure that damage to the structure is to be compensated for by <br />the Permittee; and; <br />3. The proposed mining and reclamation operations can be carried out in <br />conformance with the requirements of the Act, and the Hard Rock/Metal Mining Rules and <br />Regulations. <br />E. The Permittee has made a showing satisfactory to the Board: I) that it wil] <br />employ, during and after its underground mining and/or surface operations, procedures <br />designed to minimize environmental disturbance from such operation; 2) that it will provide <br />for reclamation of the Affected Lands appropriate to the subsequent beneficial use of such <br />lands; and 3) that, in the event of the failure of its proposed reclamation plan, it will take <br />whatever measures may be necessary to assure the success of reclamation of the lands <br />affected by such operations in accordance with the Act. <br />F. A copy of the Permittee's application, as amended and supplemented, has <br />been approved by the Board and is, by this reference, incorporated herein. <br />G. The issuance of this permit does not relieve you from having to comply with <br />all applicable Federal, State and County statutes, including State water law. <br />GRANTS. CONDITIONS AND AGREEMENTS <br />The Board, in reliance upon the representations and promises made in the permit <br />application, as amended and supplemented, and the performance warranty, hereby issues <br />a life of the mine permit to the Permittee, to engage in the operations described in the <br />application on certain lands lying in the County of Pitkin, State of Colorado. These lands <br />are described in the permit application, as amended and supplemented, and are referred to <br />herein as the "Affected Lands". <br />This permit is issued subject to the following conditions and agreements: <br />1) The Permittee will be bound by all applicable requirements of the Act, and <br />all applicable rules and regulations of the Board, as amended from time to time, the terms <br />of the permit application, the terms of the performance warranty, and the terms of the <br />financial warranty filed with the Division. <br />2) The Permittee will file with the Division its annual report and fees on each <br />anniversary date of this permit. <br />3) If analyses of the mining and reclamation operation and the data collected <br />through monitoring and experimentation by the Permittee or monitoring by the Division <br />