Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />• -8 • <br />EXHIBIT D <br />RECLAMATION PLAN: <br />Attached is the Reclamation Plan prepared by the Baca <br />County Soil Conservation Service. This plan will be <br />followed by the operator. <br />The estimated costs to reclaim the mining site are: <br />Backfilling: <br />1 loader - 12 hours $ 420.00 <br />1 dozer - 12 hours 420.00 <br />2 men - 12 hours 196.00 <br />3 trucks - 10 hours 750.00 <br />3 men - 10 hours 195.00 <br />Top Soil Application: <br />1 loader - 10 hours 350.00 <br />1 man - 10 hours 65.00 <br />Seeding: <br />1 tractor and <br />grass drill - 4 hours 100.00 <br />1 man - 4 hours 26.00 <br />Mulching: <br />2 trucks - 10 hours 250.00 <br />1 loader - 10 hours 350.00 <br />3 men - 10 hours 195.00 <br />Moving equipment from Two Buttes: <br />1 semi and lowboy <br />trailer - 2 1/2 hours 87.50 <br />1 man - 2 1/2 hours 16.25 <br />1 loader to site - 1/4 26.25 <br />1 dozer to site - 1/4 26.25 <br />1 loader to top soil <br />site - 1 1/2 hours 52.50 <br />Grass seed 100.00 <br />TOTAL $ 3,625.75 <br />+ 15.8% 572.86 <br />GRAND TOTAL $ 4,198.61 <br />