Laserfiche WebLink
© 9.0 RECLAMATION COST ESTIMATE <br />I• <br />r1 <br />U <br />r1 <br />-_J <br />The following summazizes the anticipated reclamation costs associated with the 1998 Elk <br />Creek Exploration Program: <br />Plugging and Sealing Drillholes - 12 (4" x 300 ®5300/hole <br />Backfilling Trench - 7,500 cy (200' x 40' x 25~ @ 50.60/yd. <br />Backfilling Mud Pits - 12 (~ 24 cy (20' x 8' x 4~ ®50.60/yd <br />Regrading Trench Disturbance Area - 0.5 acre ~ 52,000/acre <br />Regrading Drill Pads - 12 ®0.1 acre ~ 52,000/acre <br />Soil Replacement -Not applicable (previously disturbed areas) <br />Revegetacion -Not applicable (previously disturbed azeas) <br />Tota[ Direct Costs <br />Tota! Indirect Costs ~®12 percent) <br />Total Estimated Reclamation Cost - <br />53,600.00 <br />4,500.00 <br />200.00 <br />1,000.00 <br />2,400.00 <br />511,700.00 <br />1,400.00 <br />513,100.00 <br />iv~e:ivn c~eyiwr <br />vim ~ <br />