Laserfiche WebLink
~. <br />,- a <br /> <br /> <br />DIVISION OF MINERALS AND GEOLOGY III I II I II I II IIII III <br />Depanmem of Natural Resources <br />I) i ] cherman 51., Ronm 1I 5 <br />Denver. CO A0i03 <br />Phone IIeJl A66J 56J <br />FA% IJOJI AR A I p6 <br />September 2, 1993 <br />Pete Klein and Richard Zane tt <br />ZMK Mine Construction, inc. <br />P 0 Box 1811 <br />Ouray, CO 81421 <br />Re: M-91-146, LMK Gravel Pit, Permit Issuance <br />Dear Messrs. Klein and Zane tt: <br />COLOlZADO <br />~~pR~ <br />~ [)6 <br />Noy AOme~ <br />Gmwm~ <br />mn NelA long <br />Dnn~un Dnedw <br />On August 27, 1993, the Division of Minerals and Geology found ZMK Mine <br />Construction Inc to have satisfied the applicable requirements of <br />C.R.S. 34-32-101 et sew. for obtaining a mining and reclamation permit. <br />therefore, a permit is being Issued. Two signed originals of the permit have <br />been executed. We have kept one copy for our files and are enclosing one copy <br />for your use. Please read the terms of the permit. It is your responsibility <br />to comply with all of the terms of the permit. As a reminder, here are a few <br />things we feel are important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none has been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, August 27, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />5175.00. Please consult Aule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1 )(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely <br />MICHAEL B. L G~ <br />Division Director <br />MBL/dlm <br />Enclosure/6381G <br />