Laserfiche WebLink
• ~II II~I~~II~II~~ ~I~ <br />C crF~us <br />"'~ Smpire Corporation <br />October 5, 1994 <br />Barbara Pavlik <br />Environmental Protection Specialist <br />Division of`Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br />P.o. eox sa <br />Craig, Colorado 81626 <br />303-824-8246 <br />i~Fi~.~;~1F!-? <br />OCT l i l~ <br />Clt iSiUi i Ui mlillere~5 a vB009Y <br />Re:'Adeauacv Response; NOI No: X-94-214-00, Cvarus Empire Coraoration <br />Dear Ms. Pavlik; <br />The #olloWing infbrmation is being provided in response to your initial adequacy review. <br />Each DMG item is restated, and followed immediately by CEC's response. <br />DMG Concern <br />Completeness <br />The NOI application is complete except for the following: <br />iL ~ 1) Right of access from the various landowners for the drill sites and seismic <br />transects, a • n ' ' (~~(~ J <br />2) Exploration License from the Bureau of Land Management (BLivf), <br />31 Cultural Resources Inventory and clearance from both BLM .and the State <br />,, -'• ~~~ Historical Preservation Office (SHPOI. <br />41 Threatened and Endangered Species clearance from both the.Colorado Division <br />,_ . ~'~C of Wildlife (CDOW) and the United States Fish and Wildlife Service (USFWS). <br />With reference tb 1), above, the Division understands that ;here are many different <br />landowners for the various drill sites, that obtaining right of access may. be a time- <br />consuming prooess,t hat right of access may be obtained more easily and .quickly from <br />some landowners. than from others, and that the proposed duration of exploration <br />activities is from October, 1994 through September, 1996. If the approval of the entire <br />NOI is delayed because of delays in obtaining right of access from several of the <br />landowners, the period of exploration activity could be severely shortened: However, <br />