My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26170
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:41 PM
Creation date
11/20/2007 6:21:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
7/28/2002
Doc Name
NPDES Certification
From
CDOH WQCD
To
Basin Resources
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ~~ <br />PARTi <br />Page No. 7 <br />Permit No. COG-650000 <br />_ . _. • ' ~~7 ~' . . <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Stormwater Manaeement Plan (SWMP) (continued) <br />c. Erosion and Sediment Controls - Descnbe BMPs that will be used to reduce erosion and prevent sediment delivery [o State <br />waters. These should include stmctural (such as silt fences, sediment ponds, drop structures, check darns) and non- <br />sttuctmal (such as mulching and revegetation) methods. <br />Whenever a facility or a portion of a facility enters the post-mining phase, it is likely that the overall configttration of the <br />site will change considerably. Prior to the time when new vegetation becomes established, the surface areas will be subject <br />to potentially significant erosion. The permittee will need to take adequate measures in order to minimize this erosion as <br />well as the erosion normally encountered during mining activities. <br />d. Identification of Dischazees other than Stormwater -The stormwater conveyance system on the site shall be evaluated for <br />the presence of discharges other than stormwater, such as mine drainage, spoil springs, sanitary waste, or process water of <br />any kind. The SWMP shall include a description of the results of any evaluation for the presence of discharges other than <br />stormwater, the method used, the date of the evaluation, and the on-site drainage points that were directly observed during <br />the evaluation. <br />b) Facility Inspections <br />Qualified personnel identified by the operator shall make a comprehensive inspection of their stormwater management system, at <br />least twice per year (in the spring and fall), except as provided in paragraphs d and e, below. These comprehensive inspections must <br />be documented and snmmari~.d in the Annua! Report (see Part I.D.2. of the permit). <br />1) Material handling areas, disturbed areas, areas used for material storage that are exposed to precipitation, and other potential <br />sources ofpoltution identified in the SWMP in accordance with Part I.B.2.a)1) of dris permit shall be inspeRed for evidence of, <br />or the potential for, pollutants entering the drainage system. Structural stotmwater management measures, sediment and control <br />measures, and other structural pollution prevention measures identified in the plan shall be observed to ensure that they are <br />operating correctly. A visual inspection of equipment needed [o implement the plan, such as spill response equipment, shall be <br />made. <br />2) Based on the results of the inspection, the description of potential pollutant sources and pollution prevention measures identified <br />is the plan shall be revised as appropriate within two weeks of such inspection. Such revisions shall provide for implementation <br />of any changes to the plan in a timely manner, but in no case more than 90 days afrer the inspection. <br />3) A report summarizing the scope of the inspection, personnel making the inspection, the date(s) of the inspection, major <br />observations relating to the implementation of the S WMP, and actions taken in accordance with paragraph (b), above, shall be <br />made and retained as part of the SWMP for at least three yeazs. The report shall be signed in accordance with Part I.D.7. of this <br />permit. <br />4) Where semi-annual site inspections are shown in the plan to be intptactical for sites where an employee is not stationed or does <br />not routinely visit the site, inspections as required in this part shall be conducted at appropriate intervals specified in the plan, <br />but never less than once in two years. <br />5) Where semi-annual site inspections are shown in the plan to be impractical for inactive sites (sites where industrial activity is no <br />longer conducted), site inspections required by this part shall be conducted at appropriate intervals specified in the phur, but, in <br />no case less than once in three years. At lease one site inspection required under this part shall be conducted before October 1, <br />1999, or the date two yeazs after such site becomes inactive, whichever is earlier. <br />c) Additional SWMP Requirements. <br />1) Signatory Requirements: A copy of the plan shall be signed in accordance with Part I.D.7. and retained oa site. <br />2) SWMP Review/Changes: Upon review of the S WMP, the Division may notify the permittee at any time that the plan does not <br />meet one or more of the minimum requirements of this permit. After such notification, the pennittee shall make changes to the <br />plan and shall submit to the Division an update to dte plan including the requested changes. Unless otherwise provided by the <br />Division, the peratittee shall have 30 days afrer such notification to both make the necessary changes to the plan and to <br />implement them. <br />
The URL can be used to link to this page
Your browser does not support the video tag.