My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26155
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:41 PM
Creation date
11/20/2007 6:21:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993080
IBM Index Class Name
Hydrology
Doc Date
3/3/1994
Doc Name
THE MODEL STORMWATER MANAGEMENT PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 1: DESCRIPTION OF INDUSTRIAL ACTIVITIES <br />_InduStrial Activities conducted at this site include a Cand & <br />Grave Mining Operation. - <br />Description ofi Minin^ Activities: <br />Mining at this site is conducted per the requirements of our <br />MLRB permit. Specific details of the Mining and Reclamation <br />Plans can be referenced in that permit. <br />In summary, the area to be mined is stripped and topsoil is <br />stockpiled nearby in a berm configuration. Then the area <br />will be excavated using standard clay mining practices. <br />Overburden is stockpiled for future slope building in recla- <br />mation. Pit Run material is stockpiled for transport to the <br />• operator's brick plant. <br />When the active area of mining is depleted, reclamation will <br />commence as specified by the Mined Land Reclamation Permit. <br />As the mining operation evolves through time, there will be <br />an area undergoing preparation for mining, an area of active <br />mining, and areas in various stages of reclamation. Both <br />during mining and reclamation, grading insures that drainage <br />is retained on the site, primarily within the excavated area. <br />Description of Pracessino Activities: <br />There will be no processing on site. The pit run mined clay <br />will be stockpiled only for transport to the brick plant. <br />u <br />
The URL can be used to link to this page
Your browser does not support the video tag.