Laserfiche WebLink
<br />6.3.4 F_XF?IBTT D- Reclamation Plan <br />(a) When the pit is exhausted, the overburden will be replaced. <br />(b) The maxinaun gradient of the reclaimed slopes will be ten to one. <br />(c) `r'he primacy measure that will be taken to revegetate the site will be <br />the planting of Turkey Red Winter Wheat, consistent with the balance <br />of the surrounding faun land. <br />(i) Wheat will be planted at a rate of thirty pounds per acre. <br />Soil analysis is included in Soil Conservation information. <br />(ii) The site will be seeds] during the reclartt3tion phase when the <br />pit is exhausted. The seedbed will be chiselled. No ferti- <br />lizers will be employed. <br />(iii) None, see (i) abrne. <br />(iv) Non- applicable, see (i) above. <br />(v) Non-applicable <br />(vi) No shrubs or trees will be planted. <br />(d) None existing, or in plan. <br />(e) None involved •' <br />(f) A written estimate of the actual costs to reclaim the site is attached. <br />'r'he quote is from B & T Ekcavating of Wellington, Colorado. Back- <br />fillinq, grading and topsoil application will be done by B & T Lycca- <br />vating. Seeding and labor tc crniplete reclamation will be done by <br />Doyle Russell, applicant. The total reclamation cost of $5,139 is <br />broken down into: <br />-backfilling-51,285 <br />grading--$1,285 <br />-topsoil application--$1,285 <br />-labor--$1,285 <br />The paint of maximum disturbance shall be reached when th pit encan- <br />passes the entire six acres permitted. The cast per cubic yard for <br />grading is fifty cents. Finish grading of subsoil is 12.SC a yard, <br />topsoil application cost is 12,St per yard. Fertilizer and mulch will <br />not be utilized. Cost of Turkey Red Winter Wheat seed per acre is <br />approxirrately $3.50 per acre. <br />(2) All Equipment costs, operator wages aryl benefits, fuel and lubricant <br />consumption and depreciation are included in the independent oontractor,s <br />estimate. Nbbilization and demobilization of ezuipment are also in- <br />cluded in the bid. <br />(3) All items referenced in the reclamation plan are included in the <br />cost calculation. <br />