Laserfiche WebLink
• <br /> <br /> <br />Computer Simulation for Drainage Area of Culvert MC-3 <br />ABBREVIATED <br />SUBWATERSHED NAME <br />TOPRM <br />SPOIL <br />TOP REP 1 <br />TOPREP 2 <br />UNDIS <br />Storm Event - 10 year. 24 hour <br />Rainfall - 1.7 inches <br />Condition of Drainage Area - Worst Case <br />Year in which condition occurs -2 <br />SUBWATERSHED NAME <br />Topsoil Renaved Area <br />Spoil Area <br />Topsoil Replaced for 1 Year <br />Topsoil Replaced for 2 Years <br />Undisturbed Area <br />Exhibit which refers to above - 3.5-22 <br />