Laserfiche WebLink
03/21/2001 14:28 <br />I <br />~~ 19, 2001 <br />t?O Bmc ~ e2 <br />ewe creek co <br />8t~ <br />bear Ms. -towey. <br />vo e~ zs~ <br />r+~c. co <br />6/4'r~ <br />PAGE 03 <br />~e~~v~ <br />M <br />0 00. AR21 ?~Ol <br />N;B~no ~~FeM <br />M;~a~ais $ G eB <br />4jy <br />n repents to our telephone oortversetion. the l3lJiA should be responsihle for the kTMrp d a vvetar <br />Drape right if there Is to be a pond corraUttded on their lands for tltek beneR. In egad, you Mould <br />'mpiy be sorrrewhet d a 'oorNractor' for them. CurterAy, there la no dea'eed water right el ttre location <br />your professed pond. K a water lmpoundmerrt sWrture Is to be eonshuded, i wi fe1 wi1Mn the <br />Drily system d the Sale d Colorado. One passiWGly would be to tie an the pond for stock use. <br />odc ponds utrually era rat requYed to have an outlet valve kbtaNed. One stipulation for INhrp on a <br />fiord for stock use b that the drainage be dry 80% o/ the year. This area d the west foAc d Dry Creek <br />~s meet this aiterbn. <br />would nd arttidpete the irKeroepfkn of Around water firm your quarry. Should ground water be <br />Intercepted, we would need to address lost Issue separately. My water raptured 5om n,noff would <br />to be released during a `cal' on Qry Creek lam not aware d a caN ever being placed on Dry <br />k therefore I would nd arrtlclpete any irYerference whatsoever by your proposed ouarty. <br />piealB feel tree to oorrtad me with any further queatlotts. <br />~lncereN. <br />Waron R Todd <br />M1lVater CartvNsdoner <br />19706772921 <br />• • <br />