Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />~S NPDES No. /U,v~ <br />Date of~lnspection ~Il~rh / ~ ~ i4 <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, Moderate, Fe -, Poor <br />2. Erosion forming gullies: Extensive, Some, ery Fe None <br />3. Is wave action causing erosion: <br /> On the upstream embattlement? Yes No C' <br /> At the principal spilhvay inlet? Yes No rr <br />A. Erosion of the don•ns[ream toe of the embanlcmettt? Yes No C--- <br /> The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No /~ <br />Could [his seepage cause potential instability? Yes No <br />PRINCIPAL SPILLWAY N°1` i?r'~t.tee~c~ \ r`e~w`~ '~'~ r`y`e' ~Oi~aro~,de•~' <br />1. Is the principal spillway system in working order? Yes No <br />2. Is the iNet free of debris and restrictive material? Yes No <br />3. is the discharge outlet free of restrictive material? Yes No <br />•3. Is erosion occurring at the discharge outlet? Yes No <br />Evaluate [he severity: Extensive Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />L Is the overall emergency spillway system capable of passing design storm discharge' <br />Yes No <br />2. Dots it appear as if the emergency spillway has discharged watr>r since the last inspection? <br />Yes Na <br />3. Is erosion occturing at any section of the emergency spillway? Yes No <br />Describe the extent: _. <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Yes No~_ <br />[f yes, explain: <br />tilea_§'e abd any speeial coollnbnts concerning potentially dangerous p Pblems•on the back of this <br />sheet! ~ <br />Inspected by: ~ ,~0 .i <br />