My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26097
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:38 PM
Creation date
11/20/2007 6:18:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
2/3/2000
Doc Name
2nd to 4th Qtr 1999 Inspections
From
PEAK PROJECT MANAGEMENT
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond~~ <br />Date of Inspecti <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, Moderate, w Poor <br />2. Erosion forming gullies: Extensive, Some, ery w, None <br />3. Is wavc action causing erosion: _ <br />Ou the upstream embankment? Ycs No ~ <br />At the principal spilhvay inlet? Yes No L <br />4. Erosion of the downstream toe of the embankment? Yes No [_ <br />The cause of the erosion is attributed to: <br />5. is seepage occurring through the dam? <br />Could this seepage cause potential instabilin~? <br />Yes No ~ <br />Yes No <br />PRINCIPAL SPILLWAY /~~ Na'1~.~'~u_= ~(~l"~Q.P~~z~ ~G_~Dy'r~f7/NNK.~ <br />1. Is the principal spillway system in working order? Yes No <br />2. Is [Ite inlet free of debris and restrictive materiail? Yes No <br />3. is the dischazge outlet free of restrictive material? Yes No <br />~. is erosion occurring at the discharge outlet? Yes No <br />Evaluate the severity: Extensive Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is [he overall emergency spilhvay system capable of passing design storm discharge? <br />Yes No <br />2. Does it appear as if the emergency spillway has discharged wator since the last inspection? <br />Yes No <br />3. is erosion occurring at any section of the emergency spilhvay? Yes No <br />Describe the extent: <br />SEDIMETVT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Yes No~_ <br />If yes, explain: <br />>sleaseaNU any special conilnents cooceming potentially dangerous problems•on the back of this <br />sheet! /J ~/J /~ <br />Inspected by:_/~-~ %~~L c/yrL,K-~ <br />~NPDES No. prL,~t~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.