Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond ffCl~-t T/mss I~RF,v4 NPDES No. pD 7 <br />Date of nspection ~'!I~-,t?[lf /~~ /~ <br />EMBANKMENT <br />L Adequacy of the vegetative cover: Excellent, od e, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, e F None <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No r, <br />At the principal spillway inlet? Yes Nom <br />4. Erosion of the downstream toe of the embankment? Yes No~_ <br />The cause of the erosion is attributed to: <br />5. is seepage occurring through the dam? Yes No ~~ <br />Could this seepage cause potential instability? Yes No <br />Explain: <br />PRINCIPAL SPILLWAY <br />I. Is the principal spillway system in working order? Yes ~- No <br />2. Is the inlet free of debris and restrictive material? Yes L- No <br />3. Is the discharge outlet free of restrictive material? Yes ~ No <br />~. Is erosion occurring at the discharge outlet? Yes No ~ <br />Evaluate the severity: Extensive titoderate Just Startine None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge'' <br />Yes _(~ No <br />2. Doffs it appear as if the emergence spillway has discharged vvattir since the last [nspection'' <br />Yes No ~' <br />3. Is erasion occurring at any section of the emergency spilhvay? Yes No L- <br />Describe [he extent: _. <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design stom a capactty_ of the reservoir been surpassed'? <br />~. explain: ai(J C'L.P- ~FLZ ~ya <br />ltilei~e• aN'd any special conifneots concerning potentially d.wgerWS problems•no the back of this <br />sheet! ,~ ~j/ <br />'Inspected by:~~,~~F~.~c„„iv+-~ <br />