Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Date of Inspection <br />NPDES No. lD~ <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: .cell t, Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, ry Fe None <br />3. Is wave action causing erosion: <br /> On the upstream embankment? Yes No f- <br /> At [he principal spillway inlet? Yes Nom <br />4. Erosion of the downstream toe of the embankment? Yes No ~ <br /> The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No !/' <br />Could this seepage cause potential instability? Yes No <br />Explain: <br />PRINCIPAL SPILLWAY <br />1. Is the principal spillway system in working order? <br />2. Is the inlet free of debris and restrictive material? <br />3. Is cite discharge outlet free of restrictive material' <br />Yes //' No <br />Yes r No <br />Yes V No <br />q. Is erosion occurring at the discharge outlet'? Yes Nom <br />Evaluate the severity: Extensive Moderate Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge'? <br />Yes / Na <br />2. Does it appear as if the emergency spillway has discharged wator since the last inspection? <br />Yes No / <br />3. is erosion occurring at any section of the emergenry spillway? Yes No / <br />Describe the extent: _. <br />SEDIMENT STORAGE CAPACITY <br />I. Has the' design storage capacity of the reservoir been surpassed? Yes No !/ <br />b` yes. explain: L xc TG...,, v _ . (t l ~n-r~>7 [:J~ ~' ~ ~, ~~,,,.,~ /1/0 _ - <br />ijfeade aNU any special counts concerning potentially dangerous pr lems•oo the back of this <br />sheet! <br />Inspected by: <br />