Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />#/ NPDES No. ~.dE <br />Date oflnspection /y1A.,~TT~Ryy <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: .cell u, Moderate, ~c'w, Poor <br />2. Erosion forming gullies: Extensive, Some, ery Fe v, None <br />3. Is vva~ e action causing erosion. <br />On the upstream embankment? <br />At the principal spillway inlet? <br />~. Erosion of the downstream toe of the embankment? <br />The cause of the erosion is attributed to: <br />Yes No L-- <br />Y'es No [-- <br />Yes No ~ <br />5. Is seepage occurring through the dam? Yes <br />Could this seepage cause po[ential instability? Y'es <br />Explain: <br />PRINCIPAL SPILLWAY yo t- ~¢t,~C~/Jc.L= \~''~'~~~' <br />1. Is the principal spillway system in working order? Yes _ <br />2. Is the inlet free of debris and restrictive material? Yes <br />3. Is the discharge outlet free of restrictive material? ~'es <br />1. Is erosion occurring at the discharge outlet? Y'es <br />Evaluate the severity: <br />Extensive Moderate <br />No ~-- <br />No <br />~YTiti Ccw7`~u~lxe t~$ <br />No <br />No <br />No <br />No <br />Just Smrune None <br />EMERGENCY SPILLWAY <br />L is the overall emergency spilhvay system capable of passing design storm discharge? <br />Y"es No <br />1. DoeY it appear as if the emergency spillway has discharged watE: since the last inspection? <br />Yes No <br />3. Is erosion occurring at any secuon of the emergency spillway? Yes No=,_ <br />Describe the eaten[: _. <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Yes _ No `_ <br />L`ye~, explain: __ _ <br />Ptease•a~ any special com^YEnts concerninc potentially d2ngerott problems •!h tlTe back of this <br />sheet! ///~ /J~ <br />Inspected by: /~+a.r~f' <br />