My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26097
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:38 PM
Creation date
11/20/2007 6:18:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
2/3/2000
Doc Name
2nd to 4th Qtr 1999 Inspections
From
PEAK PROJECT MANAGEMENT
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIN RESOURCES, INC. <br />SEDIMENTATION POdN. D INSPECTION FORM <br />Pond ~Q!>i9' Coro (a~4i~!//1fesu ~.S NPDES No. .Gbd.: <br />Date of Inspection ~~~~ ./Q,~q <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, Moderate, ~ Poor <br />2. Erosion forming gullies: Extensive, Some, ~ Very F w, None <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No ~^ <br />At the principal spilhvay inlet? Yes No C.~ <br />4. Erosion of the downstream toe of the embankment? Yes No C.~- <br />The cause of the erasion is attributed to: <br />5. Ls seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes <br />Yes <br />No~G <br />No <br />PRINCIPAL SPILLWAY A/~ r!<P1~.ICAdc.t= ~ I erlXr GlW/ rii <br />1. Is the principal spillway system in working order' Yes <br />2. Is the inlet free of debris and restrictive material? Yes <br />3. is the discharge outlet Gee of restrictive material? Yes <br />~. Is erosion occurring at the dischazge outlet? Yes <br />Evaluate the severity: <br />Extensive Moderate <br /> <br />No <br />No <br />No <br />No <br />Just Starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge? <br />Yes No <br />2. Does it appear as if the emergency spillway has discharged water since the last inspection? <br />' Yes No <br />3. Is erosion occurring at any section of the emergency spillway? Yes No <br />Describe the erten[: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Yes _ No a( <br />Please add any special comments concerning potentially dangerous problems on the back of this <br />sheet! ~ s~~~~ <br />Inspected by: ~'+ ^ I <br />
The URL can be used to link to this page
Your browser does not support the video tag.