My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26097
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:38 PM
Creation date
11/20/2007 6:18:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
2/3/2000
Doc Name
2nd to 4th Qtr 1999 Inspections
From
PEAK PROJECT MANAGEMENT
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond /~ D /~ <br />Date of Inspecli <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: <br />2. Erosion forming gullies: <br />Excellent, <br />Extensive, <br />3. Is wave action causing erosion: <br />On the upstream embanl:men[? <br />At [he principal spillway inlet? <br />4. Erosion of the downstream toe of the embankment? <br />The cause of the erosion is attributed to: <br /> <br />Moderate, Fet Poor <br />Some, ery F Nonc <br />Yes No V <br />Yes No e-- <br />Yes No ~ <br />~. Is seepage occurring through the dam? Yes No L~- <br />Could this seepage cause potential instability? Yes No <br />Explain: ~~/ <br />PRINCIPAL SPILLWAY JL/µ~ ~/p~~r~t-~ f /~`'d~""" ~f ~~`~~ ~~~~~~hp~~ <br />1. Is the prinnpal spillway system m working order' Yes No <br />2. Is the inlet free of debris and restrictive material? Yes No <br />3. is the discharge outlet free of res[ncuve material' Yes No <br />~. Is erosion occumng at the discharge nude[? Yes No <br />Evaluate the seventy: ExZenstve Moderate Just Startins None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge'.' <br />Y'es No <br />2. Doa? it appear as if the emergency sptll~Wy has discharged watE;' since the last inspection? <br />Yes No <br />3. Is erosion occumng at any section of the emergencti spillway'? Yes No== <br />Describe the extent: __ <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Y"es __ No 1/~ -. <br />If ye', explain: -- _ _ <br />Pfeas@ ad's any speeidJ com"YEnts concerning potentially dan~erd± problems ~!+t ta'e bael: of this <br />sheet! /JjJ <br />Inspected by: '~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.