My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26097
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:38 PM
Creation date
11/20/2007 6:18:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Hydrology
Doc Date
2/3/2000
Doc Name
2nd to 4th Qtr 1999 Inspections
From
PEAK PROJECT MANAGEMENT
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond_ <br />Date of <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: ExceNent, <br />2. Erosion forming gullies: Extensive, <br />3. ]s wave action causing erosion: <br />On the upstream embankment? <br />At the principal spilhvay inlet? <br />4. Erosion of the do[vnstreant toe of the embankment? <br />The cause of the erosion is attributed to: <br />NPDES No. 26n-c- <br />Moderate, Feu', Poor <br />Some, Ve ew, Nonc <br />c~- <br />Yes No <br />Yes No G-- <br />Y"es No L. <br />5. Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes No Cs <br />Yes No <br />PRINCIPAL SPILLWAY /I/.yi~~~ol(cy-`+-~- /f7i'~~'t~` ~ ~~~ ~r ~~ <br />1. Is [he principal spillway system in working order? Yes No <br />2. [s the inlet free of debris and restrictive material? Y'es No <br />3. Is the discharge outlet free of restrictive material? Y'es No <br />~. Is erosion occurrtng at the discharge outlet? Yes No <br />Evaluate the severity: E.xtensice Moderate Just Starun~ None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing design storm discharge? <br />Yes No <br />2. Doe} i[ appear as if the emergency sptlhwy has discharged wat@',- since the last inspection" <br />Yes No <br />3. [s erosion occumng at any section of the emergency spillway? Yes No_ __ <br />Describe the extent: _. _. <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? Y"es No ~_ <br />}iii, explain: ~ortJO I S ,6~y - <br />Pt'easi adyi any specitl coin^.YEnts concertliog potentially d~>;eron± problems •t~t ti1'e back of this <br />sheet! <br />Inspected by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.