My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26092
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:38 PM
Creation date
11/20/2007 6:17:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
7/15/2002
Doc Name
2nd Quarter 2002 Stockpond Inspections
From
Seneca Coal Company
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />3 tockponda or Sumps <br />INSPECTOR'S NAME: Roy Karo <br />FACILITY CONFIGURATION: Stockpond <br />SITE NAME: T-22 <br />MINE NAME: Seneca II-W <br />MINE I.D. NO.: C-82-057 <br />DATE: 6/20/2002 <br />DATE LAST INSPECTION: 3/20/2002 <br />LOCATION: SE~SWit, Sec Z0, TSN, RBBW <br />LOCATION: 8 mi S of Hayden, CO <br />OWNER'S REP.: Gregg Kitchen Gen.Mgr. <br />Circle or write in appropriate response <br />1. Angle of slope: 3.5:1 upstream, 2.5:1 downstream Total = 6:1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> <br /> At isolated points on embankment slopes: Yes ® N/A <br /> At natural hillside: Yes N/A <br /> Over widespread areas: Yes N/A <br /> From downstream foundation area: Yes N N/A <br /> "Boils" beneath stream or ponded water: Yes N N/A <br />3. Cracks or scarps on crest: Yes N N/A <br />4. Cracks or scarps on slope: Yes N N/A <br />5. Sloughing or bulging on slope: Yes N/A <br />6. *Major erosion problems; Yes o N/A <br />7. Surface movements in valley bottom or on hillside: Yes N/A <br />8. *Erosion of toe: Yes N/A <br />9. *Water impounded against downstream toe: Yes N~ N/A <br />10. Existing embankment freeboard: Approximately 3.0 feet <br />11. Increase x Decrease in water level: _ et <br />f <br />e <br />12. Cracks, bulging, or erosion on upstream face: Yes P <br />- <br />~ <br />~np N/A <br />13. Spillway erosion: Yes ® N/A <br />19. *Clogging <br /> <br /> Spillway channels: Yes N/A <br /> Diversion ditches: Yes ~ <br />~~VJJ N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions Noted in these items should Normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.