My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO26089
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO26089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:38 PM
Creation date
11/20/2007 6:17:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977560
IBM Index Class Name
Hydrology
Doc Date
8/14/2006
Doc Name
Consolidated Substitute Water Supply Plan
From
OSE
To
BBA Water Consultants Inc.
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jeffrey A. Clark <br />August 10, 2006 Page , <br />16. All parcels o1 dried up land are subject to administration pursuant to the Administration of Parcels <br />Claimed for Augmentation Credit Agreement signed by the Colorado State Engineer and Kansas <br />Chief Engineer in September of 2005. The final verification of dry up will be in the form of an affidavit <br />signed by an individual having personal knowledge of the dry up for the entire 2006 irrigation season <br />for each parcel of land listed m the approved replacement plan. All affidavits must be provided to the <br />Division Engineer by March 15, 2007 in order that the final determination of augmentation credits for <br />the irrigation season can be made along with mapping showing any revisions to the dry up acreage. <br />17. The approval of this substitute water supply does not relieve the applicant and/or landowner of the <br />requirement to obtain a Water Court decree approving a permanent plan for augmentation or <br />mitigation to ensure the permanent replacement of all depletions, including long-term evaporation <br />losses after the gravel mining operations have ceased. Application for a decree should be made <br />three years prior to the completion of mining with the intent of obtaining a decreed plan by the <br />completion of mining. Approval of this substitute supply plan does not imply a position by this office <br />on any related litigation. <br />18. This SWSP may be revoked or modified at any time should it be determined that injury to other <br />vested water rights has occurred or will occur as a result of the operation of this SWSP. Should this <br />SWSP expire without renewal or be revoked prior to adjudication of a permanent plan for <br />augmentation, all use of water under this SWSP must cease immediately. <br />19. In accordance with amendments to Section 25-8-202-(7), C.R.S., and "Senate Bill 89-181 Rules and <br />Regulations" adopted on February 4, 1992, the State Enninpp. ~h~~~ ,~,.,..~:_ <br />Cllhcfih do n,..".. i.. :_ _. .. <br />in th <br />This <br />act <br />20. Acceptance of these conditions shall be assumed unless a letter to the contrary is received by this <br />office and the Division Engineer's Office (310 E. Abriendo, Suite B, Pueblo CO 81004) within two <br />weeks of your receipt of this letter. <br />Should you have any questions, please contact Heidi Frey of this office or Kalsoum Abbasi, <br />Augmentation Coordinator, in our Division 2 office in Pueblo at (719) 542.3368. <br />erely, ~ J <br />~-./ <br />olte, P.E. <br />Assistant State Engineer <br />cc: Steven J Witte, Division Engineer <br />Charlie Judge, District 12 Water Commissioner <br />Don Taylor, District 17 Water Commissioner <br />Dan Neuhold, District 67 Water Commissioner <br />DMG <br />owwrn, v~w2ooe dcx <br />
The URL can be used to link to this page
Your browser does not support the video tag.