Laserfiche WebLink
Conclusion <br />• Sedimentation Pond 016 does meet or exceed the design and performance requirements of <br />the CMLRB's regulations. Seneca will inspect the pond quarterly to evaluate structural <br />integrity, storage capacity conditions, and remedial work requirements in accordance with <br />the approved mine permit. Therefore, pursuant to Rule 4.05.61101, the above is the <br />Sedimentation Pond 016 as-built certification report. <br />u <br />• <br />13-5F-4 Revised 06/01 <br />