Laserfiche WebLink
TABLE OF CONTENTS <br />• <br />• <br />• <br /> Paae <br />Introduction 13-5F-1 <br />Embankment and Excavation 13-5F-1 <br />Design Analysis 13-5F-1 <br />Summary 13-5F-2 <br />Construction Summary 73.5E-2 <br />Conclusion 13.5E-4 <br />Addendum 13-5F-A - 10-Year, 24-Hour SEDCAD Ilnput and Outputl <br />Addendum 13-5F-B - 25-Year, 24-Hour SEDCAD Ilnput and Outputl <br />Addendum 13-5F-C - Outflow Spillway Design <br />Addendum 13-5F-D - Pond 016 Final Geotechnical Report and Summary <br />Addendum 13-5F-E - Pond 016 Compaction Testing Result <br />13-5F-i <br />Revised 06/01 <br />