Laserfiche WebLink
III I II III I II IIII III Doc Date:12/11/2001 <br />S~~ <br />• SECTION 6.0 Stock Tank and Dozer Basin Construction Through 1996. <br />6.1 Stock Tanks <br />This section updates the location of all constructed stock tanks through 1996 (see section 3.0 maps). <br />The average tank density for Trapper mined-land areas will not exceed one tank per ten acres. Table <br />6-1 describes the as-built tank densely in association with the specific drainage areas. <br />In 1996, Trapper wnstruded no new stock tanks and there are no new stock tanks proposed for 1997. <br />Trapper reGaimed nine stocc tanks during 1996. All reGaimed sites were seeded to their approved <br />rengesite mix. <br />F~dsting stock tanks meet applicable certfication standards. <br />6.2 Dozer Basins <br />As a result of the approval of technical revision TR-73 in January 1997, dozer basin locations will be <br />provided in this Appendix W document on an annual basis, beginning with this 1996 annual report (see <br />section 3.0 maps). <br />Dozer Basins assist Sediment Impoundment's in the containment of sediment, redudng the frequency <br />of Sedimerrt Impoundment Leaning. Dozer basins are typically consiructed along haulroads, regraded <br />spoils, and/or on short or long term disturbed sites. <br />eon mvi <br />to-«re~vre~ <br />u <br />