Laserfiche WebLink
_ ~ TYPE OR PRINT CLE.~IRI,Y <br />14. Present Iaad use Pasture land. <br />(i.e., agricultural, industrial, etc.) <br />15. Proposed-future land use Pasture-land.- <br />(Goal of reclamation) • - - <br />_...~... <br />INSTRUCTIONS: This application fo:-m must be submitted in duplicate and each form must <br />6e accompanied by the following information and items. The application <br />will not be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10-dap) for additional guidance. <br />EXSLBIT A - Legal Description <br />I The legal description must identify the affected land and be whollq adequate for <br />field location of the property. It can be in the form of mites and bounds survey <br />or a description by reference to township, range, and section to at least the <br />nearest quarter quarter section. Where applicable, the street address or lot <br />number(s) may be used. <br />EXHIBIT 3 - ifining Plan <br />This can be a general discussion of the methods, equipment, phases or stages of <br />the operation and those portions of Iaad affected by each. The plan should be <br />closely correlated with the map and should shoe where extraction will begin, which <br />direction it will proceed. <br />E.~IBIT C - MaP <br />This map should be as comprehensive as possible is *_erms of clearly defining <br />the permit boundaries and indicating all roads or stockpile areas to be uged is <br />connection with the operation. A.II immediately adjacent landowners must be shown. <br />The closest quarter section corner, section line, or any other locateable point <br />should also be shown on the map. <br />EY3I3IT D - Wildlife, Water Resourtes, Vegetation and Soils Information <br />Each of the above-mentioned subjects must be addressed as outlined is the <br />applicable Rale, under item number ten (10). <br />EXHIBIT E - Reclamation Plan <br />As with the mining plan, this should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process and those portions of <br />land affected by each. If possible, the plan should be closely correlated <br />with the map. If not, the narrative must be comprehensive enough to draw an <br />accurate verbal picture of the expected physical appearance of the area after <br />completion of reclamation. <br />EXHIBIT F - Proof of Local Government Approval <br />This must be a letter from the local government specifying conformance with <br />existing zoning regulations. <br />ERFiIBIT G - Source of Legal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tax <br />receipt. In lieu thereof, a statement acknowledged by a notary public that <br />the operator has the legal right to enter and mine will be accepted. <br />**FOR SPECIAL 10-DAY PER`SITS ONLY** <br />E;tHIBIT $ - Reclamation Costs <br />If the surety is requested to be less than $2500, the operator must submit <br />facts to support such request. Othezwise a surety of $2500 will automatically <br />be set. <br />E.CFiIBIT I - Terms of Governmental Contract <br />The operator must submit a copq of the contract or ocher proof that proves the <br />necessity of a special 10-day permit. The operator must also submit evidence <br />of the surety provided under the governmental contract, if it was required. <br />