Laserfiche WebLink
r <br />f <br />SOIL TYPE IN PHASE I DISTURBED AREA <br />NAP UN 11' SERLI:S <br />St 1t <br />SCCaw soil <br />DOE <br />Dullard Silty <br />U1 <br />Cl ay 1, L, Sill <br />ShC <br />Shawa Lu.uu <br />Bnl1 <br />Burnette <br />DL. <br />Dist urbed <br />U <br />Land <br />TOPSOIL AVAILABILITY <br />DEl "I'll OF "A" DEP1'H Tu BE ACREAGE <br />HORIZON REMOVED <br />27 <br />27" <br />0.11 <br />6" <br />U1 <br />1.78 <br />4o" <br />40" <br />3.3'3 <br />15" <br />15" <br />2,U4 <br />U <br />0 <br />.26 <br />VOLUME OF "A" 101AL VOLUME <br />HORIZON <br />AVAILABLE <br />(yd3) <br />(y r13) <br />400 <br />400 <br />01 <br />0! <br />17,925.9 <br />17,925.9 <br />4,111.1 <br />4,111.1 <br />0? <br />02 <br />y <br />'TOTAL 7.12 22,437 <br />** 11,481.5 yd3 required to place one foot of topsoil on Phase 1 Disturbed Area <br />l) Slope too steep to recover topsoil <br />2) Nut recommended for reclamation use <br />22,437 <br />Permit Num er <br />Class,,8 ermit _ <br />_Sec ii`an /Exhibit_ ._____._._ _ <br />! Class: O Revision <br />as <br />s O Report O Hydro OGenerel <br />eq: <br />O _ <br />Class: r <br />Doc Type: <br />DApplicalion (Coal only) O Bontl O eme <br />Enforcnt 0 Inspection <br />I I IIII I VIII VIII VIII VIII VIII IIII IIII <br />]05:: <br />DESIGNED BY _ RS _ <br />DRAWN BY G.E.K. _ <br />CHECKED BY. d.T.d. _ <br />ED BY SLC <br />APPROVED <br />DATE JUNE 1980 <br />ESPEY, HUSTON & ASSOCIATES, INC. <br />Engineering 8 Emkomental Cads MMIs <br />NORTHERN COAL CO. INC. <br />SHEET NO I <br />F SHEETS <br />( <br />ME- 8253 -08 -7/18 <br />- <br />FIGURE 13.5.2 TOPSOIL AVAILABILITY <br />-- <br />JDATE <br />FILE NO <br />884.03 <br />N0. <br />REVISION <br />BY <br />