Laserfiche WebLink
_ -. ~ .. <br />. / ... _ <br />~ ~ - <br />1. ~~ .. _ . <br />- $EDIMENTATION.POND INSPECTION FORM <br />Pond ~d~ ~ NPDE$ No. ~rr~ <br />Date of Inspection ,2 as D'Z <br />• ~ ~ .- <br />EMBANKMENT- <br />1. Adequacy of the vegetative cover: xcell t, Moderate, Few, Poor <br />2. Erosion farming gullies: Extensive; Same, ery Fey None <br />3. Is wave action causing erosion: <br />On the u stream embankment? Yes No <br />At the p ncipal spilhvay inlet? N~`~v~"~hL-29-- Yes No-~ <br />4. Erosion of the downstream [oe of the embankment? Yes Nc ~- <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No !~ <br />Could this seepage cause potential instability? Y'es __ No <br />PRINCIPAL SPILLWAY ~~ ,S~tl(w;+~ ~~/,,~`~~~~/i c~-~°- <br />1. Is the principal splhvay system in working order' Yes _.__ No <br />2. Is the inlet free of debris and restrictive material? <br />3. Is the discharge outlet free of restrictive material? <br />~. Is erosion occurring a[ the discharge outlet? <br />Evaluate the severity: <br />Extensive Moderate <br />Yes No <br />Yes No <br />Yes Vo <br />lust =[arune done <br />EMERGENCY SPILLWAY ~~ ~~L,,~yr.,.~~ S~ell~•/~ /Ur~/~~~<e~fL L~ <br />I. Is the overall emezgency spillway system capable of passing design storm dischharge? <br />Yes No <br />2. Does it appear as if the emergency spilhvay has discharged water since [he last inspection'. <br />Yes Vo <br />3. Is erosion occurring at any sec~cn ei the emergency spillway? Yes vo <br />Describe the extear. <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage~ /c,1 pacity of the reservoir been ~wpassed? 's vo Ci <br />If yes. explain ~,~,e!'i.imsrlr0,r~,.~.RCVV7/ ~c .-(~i~ ' ~ i//, ~io,~<- <br />Please add any special comments concerning potentially dangerous p • lams on the bac' of this <br />sheet! /~/> <br />Inspected bv: ~ //r~ ~"~' --~ <br />